Investigating Failure: Considerations for Reconstruction of a Bridge Exhibiting Staining
When a large-scale bridge is in need of significant reconstruction, many factors should be considered prior to initiation of the project. Part of this particular reconstruction involved repainting of the structural steel on a 40-foot-wide lift bridge that had a total length (including approaches) of 2,877 feet, with a main span of 418 feet. The …
Investigating Failure: Considerations for Reconstruction of a Bridge Exhibiting Staining Read More »